Last updated:
An Asana to Jira integration syncs a business team's Asana tasks with engineering's Jira issues in both directions. Tasks map to issues, subtasks to sub-tasks, section moves to legal workflow transitions, and comments and attachments flow both ways. Users are matched by email, rich text is converted to Atlassian Document Format, and echo loops are suppressed.
Asana's Jira Cloud integration already covers the standard sync. If it handles your objects, volumes and edge cases, use it. This page is about what changes when it does not: custom objects and fields, duplicate handling, conditional logic, and someone owning the failures.
Two teams, two tools, one piece of work. Product, marketing, and operations plan in Asana because it fits how they think about tasks, sections, and portfolios. Engineering delivers in Jira because that is where sprints, workflows, and releases live. The moment a request has to cross that line - a marketing launch that needs three engineering tickets, a bug a customer-success manager logged in Asana that a developer has to fix in Jira - somebody starts copying titles, statuses, and comments by hand.
The integration takes that copying away. It ties a defined set of Asana tasks to Jira issues: create a task in Asana, the matching Jira issue appears; a developer moves the issue to Done, the Asana task completes; a comment on either side shows up on the other. The two teams keep the tool they prefer and stop chasing each other for status.
| Asana object / event | Becomes in Jira | Notes |
|---|---|---|
| Task | Issue (Story or Task) | Issue type agreed per project; ID map keyed on Asana GID and Jira issue key |
| Subtask | Sub-task | Parent issue must exist first; ordering matters |
| Project / portfolio | Project or Epic | One-time mapping; new Asana projects do not silently create Jira projects |
| Section | Workflow status | Section move driven as a Jira transition, not a raw status write |
| Completed flag | Done transition | Respects Jira’s workflow; a blocked transition is handled by rule, not ignored |
| Assignee | Assignee | Matched by email where visible; unresolved users fall back to a default or a flag |
| Custom field (enum / number / text) | Custom field | Asana field GID mapped to Jira customfield_ID; enum values aligned once |
| Comment (story) | Comment | Posted via integration user, prefixed with original author |
| Attachment | Attachment | Downloaded from Asana and re-uploaded, within Jira size limits |
| Tag | Label | Free-text labels; Jira has no spaces in labels |
| Dependency (blocked by) | Issue link (blocks) | Both endpoints must be synced for the link to resolve |
| Due date | Due date | Time zone normalised so a date does not shift a day |
For each field we agree which side wins - typically Asana for due dates and business context, Jira for status and engineering estimates - and the sync enforces that rule on every update.
Creating a Jira issue from a new Asana task is the easy part. Two-way sync fails on these:
Asana and Jira events arrive by webhook (with a scheduled reconciliation pull as a safety net), are validated, translated through your agreed field and workflow mapping, and written to the other side - each write tagged so its returning webhook is recognised and dropped rather than re-applied.
A shared map pairs every Asana task GID with its Jira issue key, so a retried webhook or a reconciliation pull updates the existing issue rather than opening a second one. Task descriptions, comments and the names in them run through AWS infrastructure hosted in the EU.
We operate the sync after launch. Failed transitions, unresolved users and upstream changes on either platform are handled by a named owner under an SLA instead of landing on whoever built the first version.
If one Asana project mirrors one Jira Cloud project with standard fields, Asana’s built-in Jira Cloud integration is the right tool and we will tell you to use it. If you only need a one-way trigger, a point tool like Zapier or Unito is enough (managed integration vs iPaaS covers that trade-off). A managed sync makes sense when the link is bidirectional and load-bearing across many projects: when status has to stay true in both tools, when comments and attachments matter, when duplicated or mismatched users are causing real confusion, or when a brittle in-house sync keeps looping, drifting, or dropping updates and someone on your team has become its full-time operator without anyone deciding so.
Weighing an iPaaS tool, a freelancer or an in-house build instead? Compare the options →
Need this integration built and permanently operated? Tell us which systems connect and what data has to move. Fixed-price scoping quote within 48 hours.